The below information is intended for contractors interested in bidding on the Timber Sky Starter Home Project. Please note, Davis/Bacon requirements do not apply to this project.
CONTRUCTION PLANS FOR TIMBER SKY
IFB DOCUMENT
SOILS REPORT
All bidders should account for all soil removal/OX and replacement under building pads and roadways as indicated in the soils report.
BID SCHEDULE
GRADING PLAN (Anticipated Starting Topography)
ATTACHMENT C
GRADING CAD
Please contact jenn@h4hnaz.org it get a copy of the Timber Sky Grading CAD Plan
Please note the following:
No concrete steps into the units – these will be wood by the vertical team
All building pads shall be prepped and certified as per the soils report
Earthwork is to be based as the starting point assumed to be per CAD file and anticipated starting topography
Any deviation as left from the current mass grading project will be adjusts (+/-) on your bid cost/cy of cut and fill, as appropriate
That SOW will be verified via LiDAR
Ignore/disregard the percentages at the bottom of the form regarding testing, mobilization, inspections, traffic control, as-builts, staking, etc. If your team is bidding these scopes, place your cost for that scope, complete.