The below information is intended for contractors interested in bidding on the Timber Sky Starter Home Project. Please note, Davis/Bacon requirements do not apply to this project.

CONTRUCTION PLANS FOR TIMBER SKY

View PDF

IFB DOCUMENT

View PDF

SOILS REPORT

View PDF

All bidders should account for all soil removal/OX and replacement under building pads and roadways as indicated in the soils report.

BID SCHEDULE

View PDF

View Excel

GRADING PLAN (Anticipated Starting Topography)

View PDF

ATTACHMENT C

View PDF

GRADING CAD

Please contact jenn@h4hnaz.org it get a copy of the Timber Sky Grading CAD Plan

Please note the following:

  • No concrete steps into the units – these will be wood by the vertical team

  • All building pads shall be prepped and certified as per the soils report

  • Earthwork is to be based as the starting point assumed to be per CAD file and anticipated starting topography

    • Any deviation as left from the current mass grading project will be adjusts (+/-) on your bid cost/cy of cut and fill, as appropriate

    • That SOW will be verified via LiDAR

  • Ignore/disregard the percentages at the bottom of the form regarding testing, mobilization, inspections, traffic control, as-builts, staking, etc. If your team is bidding these scopes, place your cost for that scope, complete.